Fixing The Cabinet
I am almost finished fixing the cabinet to a point I can start cycling the tank.. I have added a floor to the sump also cut down the old front panel to add a back and a side wall to the sump.. Adding the back wall even though I lose 18mm of space I feel it will be beneficial in the long run with being able to screw equipment/shelves to it also may make it easier to keep it clean though I doubt that will happen.. :)