Pipes Came Up Good
Had a go at the plumbing today, nothing is glued in yet but will be. I ran the 6mm RO line through the roof and its now all connected and ready to fill with timer.
Still to complete the return lines...
I will add valve on the 45 degree right had side pipe and maybe even one on the horizontal left pipe. My current tank has valves i'm re-using so i'm waiting that.
Still to complete the return lines...
I will add valve on the 45 degree right had side pipe and maybe even one on the horizontal left pipe. My current tank has valves i'm re-using so i'm waiting that.