August update
Now have 99% of the parts for the Auto water changer delivered. I have updated the drawing to show the circuit and the wiring diagram for the relay bases. Have got the 1/4" tube and a couple of john guest quick connect fittings which attach direct to the tunze pump. Hoping to get the tubing run this weekend, lucky i already have the ATO RO tubing running outside so should not be too difficult. I just have to work out heights to ensure no syphon. Only thing left is the NSW container, saw a good small 50L bin in bunnings today for $19.00 which I may end up using. Thats the last item I need.
Glad I can still edit these old TJ. No time to mess around with converting to the new format !
Now have 99% of the parts for the Auto water changer delivered. I have updated the drawing to show the circuit and the wiring diagram for the relay bases. Have got the 1/4" tube and a couple of john guest quick connect fittings which attach direct to the tunze pump. Hoping to get the tubing run this weekend, lucky i already have the ATO RO tubing running outside so should not be too difficult. I just have to work out heights to ensure no syphon. Only thing left is the NSW container, saw a good small 50L bin in bunnings today for $19.00 which I may end up using. Thats the last item I need.
Glad I can still edit these old TJ. No time to mess around with converting to the new format !